Programme certainty for mission-critical delivery.

In a market where time is the number one factor, we help clients win tenders and deliver jobs, then build the in-house planning capability to do it repeatably.

700 MW+Programme capacityHyperscale delivery
$2.1B+Programme valuePlanned and controlled
13+ sitesHyperscale sites3 operators · 3 regions

Operator proof

Built for the pressure of live programmes.

We embed with owners, developers and EPCs to plan, control and de-risk complex data-centre and critical-infrastructure programmes, so they deliver on time, on budget and ready for service.

Microsoft hyperscaleMEL04 · MEL05 · MEL11 · 324 MW · $900M+Delivered
Stack InfrastructureMEL01 · MEL02 campus · 288 MW · $1.08BSuccessive stages
NextDCM2 Stage 5 & 6 · D1 Darwin · 87 MW · $280MLive-site
ANZ · APAC · EMEAMission-critical portfolio · 13+ hyperscale sitesActive capability

Lifecycle control

From early works to controlled handover.

One programme, four readiness gates. Scroll through the lifecycle to see how the schedule moves from site strategy into commissioning evidence.

Data-centre foundations, duct banks and underground services
Nomad SPS · Integrated master programme00:00:00 / 00:00:20
Gate 01 · Site strategy

Early works

Site readiness, enabling works, procurement logic and the long-lead strategy aligned to the critical path.

Concept visualisation
Overall programme progress18% · Early works
Schedule healthOn track · +2.3%
Next key gateStructure release
Long-lead equipmentNo critical misses

Data-centre track record

700 MW+ across $2.1B+ of hyperscale programmes.

Delivered for the operators, and the head contractors who build for them, that set the pace of Australia’s market.

Microsoft

324 MW · $900M+
MEL04 · 54 MWMEL05 · 108 MWMEL11 · 162 MW
w/ Kapitol Group

Stack Infrastructure

288 MW · $1.08B
MEL01 A&B · 72 MWMEL01 C&D · 108 MWMEL02 B · 108 MW
w/ Erilyan

NextDC

87 MW · $280M
M2 Stage 5&6 · 83 MWD1 Darwin · 4 MW
Live-site expansion

Our planning philosophy

The plan comes before the schedule.

A schedule is only as good as the plan behind it, and the plan is only credible when built on a deep understanding of how the project will actually be constructed, integrated and commissioned.

01

Use the schedule as the primary coordination tool, not a compliance artefact.

02

Put buildability first: sequence, method, interfaces and constraints before software.

03

Make the plan drive the schedule, then let reporting flow from the same live source.

04

Surface delays early enough to become joint problems, not adversarial positions.

Start with the programme

Ready to de-risk what comes next?

If time is your number one factor, we would like to hear about it. Nomad SPS operates across ANZ, APAC and EMEA.